Project Subject:
Construction and Installation of Blocks F and G, Arch, and Deck of the Narenjestan 2 Bridge
Location:
Izadshahr Area, Mazandaran Province, between Nur and Mahmoudabad Cities, Iran
Client:
A.S.P Co.
Project Highlights:
-As the project progressed, the number of concurrent activities and different operational teams on site increased.
-The surrounding space around the structure was very limited, restricting maneuverability.
-Due to the high speed of construction and delivery, along with adherence to workshop requirements, on-site steel structure storage became significantly prominent.
-Extremely high environmental humidity had a notable impact on installation operations.
-Type of structural connection: Bolted
-Total weight: 5,570 tons
Implementation Year:
2011