Project Topic:
Construction and Installation of Steel Structure for Erfan Residential Towers
Location:
District 22-Tehran-Iran
Client:
A.S.P Company
Project Highlights:
1- Site Access Constraints:
Located in one of Tehran’s most traffic-restricted zones
No direct access to Shahid Hemmat Highway during construction
2- Project Scope:
Twin towers (18+24 floors)
Phased concurrent construction of multiple blocks
3- Collaborative Execution:
Simultaneous multi-team operations (concrete to finishing)
Zero-delay completion despite phase discrepancies
4- Logistical Achievements:
High-speed fabrication/transport with strict QA compliance
Minimal on-site laydown area utilization
5- Technical Specifications:
Structure type: Welded
Total weight: 4,200 metric tons
Implementation Year: